RFI & Submittal Logkeeper

Nothing falls through the cracks in CA

Automatically triages incoming RFIs and submittals, logs them with metadata, assigns owners, tracks contractual turnaround targets, and sends overdue alerts. Produces a weekly digest so you walk into every OAC meeting prepared.

CommunityWork10 min setup

INGREDIENTS

✉️Email💬Slack📅Calendar📄Google Docs

PROMPT

Create a skill called "RFI & Submittal Logkeeper" for construction administration. When I forward an email or paste a notification that contains "RFI", "Submittal", "Shop Drawing", or spec section references, you should: 1. Classify the item (RFI / submittal / ASI / CO / misc) and extract metadata: project, trade, spec section, key dates 2. Create a log entry with status, due date (RFI default: 7 days, Submittal default: 10 days), and responsible party 3. Draft a response scaffold: one-paragraph summary, decision needed, reference documents, and an attachments checklist 4. Send reminders at 48h and 24h before due date; escalate to PM if 2+ days overdue 5. Every week (timed before OAC meetings), generate a digest: new items, pending, overdue, and anything flagged as critical path Critical path keywords to watch for: "stop work", "critical", "lead time".

How It Works

During construction administration, RFIs and submittals arrive from every

direction — email, platform notifications, meeting notes. This recipe catches

them, classifies them, creates a log entry, and starts the clock on your

contractual response window. It drafts response scaffolds so you're never

staring at a blank page, and sends reminders before anything goes overdue.

What You Get

  • Automatic classification: sorts items into RFI, submittal, ASI, CO, or misc and extracts metadata (project, trade, spec section, dates)
  • Log entry creation: each item gets a status, due date, and responsible party
  • Response scaffold: pre-built structure with summary, decision needed, references, and attachments checklist
  • Timed reminders: alerts at 48h, 24h, and overdue — with escalation to PM when deadlines pass
  • Weekly digest: new items, pending, overdue, and critical path items in one view — timed to land before your OAC meeting

Setup Steps

  1. Set default turnaround times (e.g., RFI: 7 days, Submittal: 10 days)
  2. Define escalation rules (e.g., escalate to PM after 2 days overdue)
  3. List critical path keywords that trigger priority flagging ("stop work", "critical", "lead time")
  4. Connect email to catch incoming items automatically
  5. Sync with your calendar so the weekly digest arrives before OAC meetings

Tips

  • The response scaffold saves the most time — even a partial draft is faster than starting from zero
  • Use the weekly digest as your OAC meeting prep; it replaces the manual log review
  • Flag items that reference long-lead materials immediately — they become schedule risks fast
  • Keep the log as your single source of truth; resist the urge to track items in email threads